BW-01
Revetment R-4 & dune
Port-Aven,
France
47.8572° N, 3.7462° W
( Site file
A rebuilt rock revetment and a living dune along 1.84 km of the Port-Aven harbour front, in front of 1,268 homes. Monitored until 2031.
The problem
Five floods since 1910 are cut into the granite of the Port-Aven quay, and three of them came in 2010 or later. The storm of 2024 left its mark at +2.47 m. The +2.0 m quay level was a 1-in-100 event in 1950; it now comes back about once every twelve years. The old wall behind the harbour front was drawn for a sea that no longer exists.
What we built
We replayed 120 years of storms on a 2 m terrain model of the harbour front, then rebuilt Revetment R-4 in local stone and raised a dune behind it, with its crest at +4.6 m NGF, above mean high water springs at +1.9 m NGF. The dune is planted to trap blown sand and rebuild itself after each winter. Works were handed over in September 2021, under agreement PA-2021-033 with the City of Port-Aven.
Tide gauge PA-1 and the wave and settlement sensors on the revetment report every ten minutes. The contract names one indicator: peak flood depth at the quay under 0.80 m for a 1-in-100 event. Modelled depth went from 1.12 m before the works to 0.71 m after, 41 cm less, verified by Kerrow & Lisle Hydrology.
The readings are published every month for the 1,268 homes behind the line. The city holds us to the same number until the end of the term in 2031.
Coordinates
47.8572° N, 3.7462° W
Commissioned
Structure
Rock revetment and rebuilt dune, 1.84 km
Scale
1.84 km of harbour front
Partner
City of Port-Aven
Homes behind the line
1268
Sensors
38
Status
Operational
−41 cm
peak flood depth, 1-in-100
( Readings
What this site measures,
and who checks it.
R-0417
Peak flood depth at the quay, 1-in-100
−41 cm
Kerrow & Lisle Hydrology
Verified
R-0418
Dune crest level, profile P-2
+1.3 m
Atlantic Survey Review
Verified